1196 Breakdown Structure Detail Code

Codes identifying details relating to a reporting breakdown structure tree.

Type
Identifier (ID)
Length
Min 2 / Max 2
Codes
CodeDescription
01Labor
Direct labor costs
02Material
Direct material
03Other Direct Costs (ODC)
Other costs associated with a contract such as freight, travel, postage
04Subcontract
Direct subcontract
05Labor and Material
Sum of labor and material items
06Labor Overhead
Indirect costs associated with direct labor
07Material Overhead
Indirect costs associated with direct material
08Other Overhead
Indirect costs associated with other direct costs
09Total Overhead
Total of all indirect costs incurred on a contract
10Total General and Administrative
Total of all general and adminstrative types of indirect costs incurred on a contract
11Engineering Labor
Direct engineering labor
12Engineering Overhead
Indirect costs for engineering effort
13Manufacturing Labor
Direct manufacturing labor
14Manufacturing Overhead
Indirect costs for manufacturing effort
15Interdivisional Work Authorization
Work to be performed within the same company, but at a different division. Coding allows tracking of the costs associated with the other division (because indirect costs may be different, etc.)
16Intercomponent Work Authorization
Coding to identify different work groups who may be doing contract work for a specfic company or division
17Change Document Number
Contract number to track change documents and related tasks or costs associated with contract changes
18Funds Appropriation
Coding to track the source of funds (such as various goverenment agencies)
19Nonrecurring Labor
Labor costs that will only be incurred once
20Nonrecurring Material
Material costs that will only be incurred once
21Nonrecurring Other Direct Costs
Other direct contract costs that will only be incurred once
22Nonrecurring Subcontract
Subcontract costs that will only be incurred once
23Nonrecurring Labor and Material
Sum of labor and material costs that will only be incurred once
24Nonrecurring Engineering Labor
Engineering labor costs that will only be incurred once
25Nonrecurring Manufacturing Labor
Manufacturing labor that will only be incurred once
26Recurring
Costs that will incurr continually over the life of the contract
27Nonrecurring
Costs that will only be incurred once
28Total
29Nonrecurring and Total
30Recurring and Total
31Direct Cost or Hours
32Plant-wide Overhead
33General & Administrative
34Cost of Money
35Profit or Fee
36Total Price
37Total Cost Less General & Administrative
38Total Cost Plus General & Administrative
39Other Costs
40Standard
41Variance
42Purchased Equipment
ZZMutually Defined

Stedi is a registered trademark of Stedi, Inc. Stedi's EDI Reference is provided for marketing purposes and is free of charge. All names, logos, and brands of third parties listed on our site are trademarks of their respective owners (including “X12”, which is a trademark of X12 Incorporated). Stedi, Inc. and its products and services are not endorsed by, sponsored by, or affiliated with these third parties. Our use of these names, logos, and brands is for identification purposes only, and does not imply any such endorsement, sponsorship, or affiliation.